How to Ship Animatronic Dinosaurs and Animals

A comprehensive end-to-end logistics engineering guide: freight modes, container utilization formulas, protective dismantling, international handling, and dockside assembly.

A 15-metre T. rex leaving our workshop in Zigong gets packed, taken apart, loaded into a container, cleared for export, carried across an ocean, cleared again, and lifted into position at the far end. Most of that we handle.

The parts that need you are the parts nobody usually explains: how many containers your order actually takes, what the freight looks like, and what has to be standing ready on site before the truck pulls in.

Those three questions come up in every project. The answers depend on your order; the way they are worked out does not change. So here is how it goes.

01 · Choosing the mode

Sea, rail or air: choosing how it ships

Sea freight is the default, and for good reason. A 40-foot high cube (40HQ) or a 20-foot container (20GP) costs the least per unit and takes just about anything we build. The trade-off is time.

The China–Europe Railway Express sits between sea and air. It runs on containers, so everything on this page about packing, dismantling and securing applies to rail exactly as it does to sea. What changes is the route and the schedule. Publicly available figures put the full run at roughly 15 to 20 days, though border congestion and departure schedules move that around a fair bit. Your forwarder’s schedule is the number that counts.

Air freight is for small items, and mostly for one situation: you are up against an exhibition date and there is no other way to make it.

Mode Equipment Best for Typical transit Not suited to
Sea 40HQ / 20GP containers Almost every order Europe ~45–60 days; Americas ~60–90 days; Asia ~20–30 days Very tight deadlines
Rail Containers, China–Europe Railway Express Europe-bound shipments that need to beat sea Public figures ~15–20 days, schedule dependent Destinations outside Europe
Air Air pallets and air crates 2–4 m dinosaurs, skins, hand puppets A few days Oversized models

All three are shaped by departure schedules, container availability, freight rates and distance. In peak season, waiting for a container can add a week or two before anything moves at all.

02 · Container capacity

How much fits in a 40HQ or a 20GP

Start with the container itself, because everything else follows from it. Internal dimensions vary slightly between carriers, so treat these as working reference figures.

Container Internal size (approx.) Theoretical volume
20GP 5.90 × 2.35 × 2.39 m ~33 m³
40HQ 12.03 × 2.35 × 2.69 m ~76 m³

A 40HQ adds about 30 cm of height over a standard 40-foot box. That extra height matters for models with an upright posture or a high back, which is why the 40HQ is our default. One more thing worth knowing: theoretical volume is not usable volume. Gaps between pieces and the space the securing takes both eat into it, which is part of why the figures below are a guide rather than a promise.

Load & secure dinosaur in container

    

Strapped

What goes in a 40HQ

One complete 15-metre T. rex fits in a single 40HQ once it is split into its main sections: head and neck, tail, legs with their steel tubes, the base frame, and the body.

With a mix of sizes, a 40HQ generally takes 2 × 8 m, 5 × 5 m, 5 × 4 m and 3 × 6 m models together. Depending on the pose, we may take the tail off some models to free up space.

What goes in a 20GP

  • 2 × 6 m dinosaurs, shipped complete with nothing removed
  • or 5 × 4 m dinosaurs
  • or 5 × 5 m dinosaurs

These figures are not absolute. Container counts are worked out per order, adjusted for the pose and size of each model and for how much dismantling is practical at the far end. Treat them as reference. The confirmed count comes out of the order.

03 · Rail

Shipping to Europe by China–Europe Railway Express

Rail runs on containers, so the loading logic is the same as sea freight: same dismantling, same fixing points, same securing. Only the path differs.

It suits a fairly clear set of cases. Your site is in Europe, sea freight is slower than your schedule can absorb, and air freight is not justified by the numbers. Along the route, containers are transhipped wherever the rail gauge changes, and that is usually where the schedule variability comes from.

Worth knowing about the service overall: it is a scheduled pipeline rather than an emergency option, and it rewards planning ahead. Volume on the route has grown steadily, which has made departures more frequent but also made peak-season space tighter.

If your project is in Poland, Germany, Spain or Hungary, ask your forwarder to quote rail and sea side by side. The comparison costs nothing and the gap can be big enough to change your plan.

04 · Air

When air freight makes sense

Air earns its cost in one scenario: an exhibition date that cannot move. Small models are what travel well by air.

  • 2 m, 3 m and 4 m dinosaurs
  • Dinosaur skins that pack into a 2.5 m crate
  • Hand puppets and similar small pieces

Oversized models do not work by air, for two reasons that do not go away.

  • Cost. Air rates run far above sea, and the air crate adds its own bill on top.
  • Disassembly. Getting an oversized model into an aircraft hold means taking it apart much further than a container would. More pieces means a longer, riskier reassembly at the other end.

One more thing to plan for: air freight is billed on chargeable weight, whichever is greater between the actual weight and the volumetric weight of what you are shipping. An animatronic model is bulky and comparatively light, so the volumetric figure is the one you will be charged on. The crate adds to both sides of that calculation.

So if you are looking at a 10-metre-plus model and a tight date, the better move is usually to keep it on the water and re-sequence the site work rather than force it onto a plane.

05 · Packing

Packing animatronic dinosaurs and animals

Nothing gets packed until it has been fully tested.

We usually use bubble wrap rather than stretch or static-cling film, and the reason is worth explaining.

Static film looks neater. It wraps tighter, sits flatter and photographs better. That is the problem. Animatronic dinosaurs and animals have horns, ridges, raised detail and hair, and a film that sits that tightly presses those shapes down. Once they are pressed down, they do not spring back. Bubble wrap looks less tidy, but it has enough thickness to hold those structures up off the surface.

The point of packing is to get the model there in the shape it left in.

Bubble wrap on a head

  

Bubble film wrapped dinosaur

If the shipment is going as LCL (see below), everything goes into a wooden crate. We use fumigation-free crates. Under ISPM 15, packaging made from processed wood such as plywood is not classed as regulated solid-wood packaging, so it needs neither fumigation nor an IPPC mark. The condition is that the crate is built entirely from that type of processed material. These crates cost little to build and clear customs without friction, which is why we recommend them.

06 · Dismantling

Taking the model apart: marking and numbering

Large models have to be dismantled for shipping. Dismantling is not the hard part. Getting everything back together in the right configuration at the other end is.

Numbering first. Every leg that comes off is marked in pen as left, right, front or back. The steel tubes inside the legs get the same markings.

Then the flange marks. We cut marks into the mounting flanges. If the front-left leg is marked I, the front-right is II, and so on. During assembly you line up the mark on the steel leg’s flange with the matching mark on the base frame’s flange, and the leg goes on in the right place pointing the right way.

What this buys you is that assembly does not depend on anyone’s judgement. Nobody has to work out which way a leg should face, and nobody has to test-fit it twice. Line up the marks and it is correct.

Tails. Some models ship with the tail removed. Whether we take it off, and how many sections come away, depends on the pose and the space available. That is one more reason the loading figures above are a guide.

legs marks

07 · Loading

Loading and securing the container

With the models positioned, we run aircraft straps, the ratchet-tightened webbing kind, from the base frame, the body or the head to the fixing rings built into the container.

The idea is to spread the load across several points. A single tie-down works loose over weeks at sea. Several points holding the base, body and head independently keep the model where it was placed.

If your route crosses climate zones, there is one more thing worth planning for: condensation. A container interior swings between hot days and cold nights, and moisture in the air condenses on the walls and on whatever is inside. The industry calls it container rain. It is unkind to electrical components and to skins, and desiccant packs in the container are a cheap way to cut the risk noticeably.

You have two options for loading:

  • Send the container to our factory and we load it here.
  • Move the models from Zigong to a port — Guangzhou, Shanghai, Shenzhen — on a 17.5-metre flatbed, and load them yourself at the port alongside the rest of your cargo.

08 · Timing and quotes

Transit times, freight quotes and shared containers

Timing. We confirm the shipping date with you one week before your order finishes production. That gives you room to book the space and line up unloading equipment at your end.

Sea transit times:

Destination Typical sea transit
Europe ~45–60 days
Americas ~60–90 days
Asia (Japan, Korea, Indonesia, Thailand) ~20–30 days

Departure schedules, container availability, freight rates and distance all feed into those figures. Distance is the obvious one; container availability is the one that surprises people.

Quotes. Send us your requirements list and tell us your nearest port. We will come back with an initial freight figure, along with the container count and sizes it is based on.

Shared containers (LCL). If your order is too small to fill a container on its own, LCL is an option. Everything then has to go into wooden crates. Sharing a container means your models travel with other people’s cargo, and the crate is what keeps them separate. We will recommend crate dimensions that use the space efficiently. These are the same fumigation-free crates described above.

Packed wooden crate

  

Fully packed wooden crate

09 · At the destination

Unloading a large dinosaur when it arrives

Unloading is the part of shipping most often underestimated at the receiving end. Here is the standard setup for a large model.

Equipment

Item Quantity Purpose
Crane, around 12 tonnes 1 Main lifting
3-tonne forklift 2 Pulling the model out of the container, moving it on site
Transfer trolley — Moving the model to the installation area

People. Three or four able-bodied workers, with specific jobs: attaching and removing the lifting straps, helping pull the model clear of the container, and directing the operation while two machines are moving at once.

Before the equipment arrives. Three things worth confirming, or the crane sits idle once it is on site.

  • Ground strength and surface. A 12-tonne crane’s outriggers and a loaded trolley need hardstanding or steel plates.
  • Headroom. Enough clearance for the crane to raise its boom, and no overhead cables in the way.
  • Access. Whether the equipment can reach your site from the port or the main road, and whether the turning radius works.

The unloading sequence. The principle behind the whole sequence is that the model is supported at every moment. The forklift and crane hand the load back and forth, and it never hangs unsupported in between.

  1. Strap the forklift to the base frame. Two 6-metre straps, one end on the forklift’s forks, the other on the dinosaur’s base frame. The forklift reverses and pulls the model out about a third of the way, just far enough to expose the lifting points. Pull it steady and even; yanking on a base frame and leg tubes is how they get damaged.
  2. Bring in the crane. Two straps on the 12-tonne crane. The first goes to the front lifting point and takes up slack only, without carrying the weight. The second stays hanging, waiting.
  3. Keep pulling. The forklift continues reversing until about three-quarters of the base frame is clear. Stop there. The end of the frame rests on the container floor, so nothing tips.
  4. Attach the second strap. The waiting crane strap goes onto the rear end of the base frame. The crane now holds both ends and can take a little load by raising its boom slightly.
  5. Finish the pull. The forklift keeps reversing until the base frame clears the container completely. At that point the crane is carrying everything. Release the forklift straps, and lift the model to its installation position or onto the transfer trolley.
Crane and forklift mid-handover at the container door

→ Installation and maintenance guide

10 · Customs

Customs, paperwork and who handles what

You can appoint your own freight forwarder, or use one we recommend. The forwarders we work with move dinosaurs and animals regularly, and that matters more than it sounds. Unusual cargo attracts questions at customs, and a forwarder who has shipped this kind of cargo before knows which documents get asked for and how to answer the questions that come up. It usually saves a lot of back-and-forth.

A few things worth building into your plan:

  • Cargo insurance. These models are not replaceable off a shelf. If one is damaged, the cost is not only the model. It is the production lead time to build another one.
  • Free time and detention. Containers come with a free period at the destination port, and charges begin once it runs out. A container can only be collected after customs releases it, so getting the paperwork ready early matters.
  • Inspection on arrival. Photograph and film the shipment before opening anything, and raise any issues inside the claim window. It is the basis for any claim you might need to make.

Planning a shipment?

Send us your requirements list and your nearest port. We’ll put together an initial freight figure with the container count and sizes, and tell you which of the three modes fits your deadline best.

Or just tell us where you are and when the models need to be on site, and we’ll work out the route from there.

Send your list

Get a quote  ·  Browse all products