The container doors come open, and the first reaction is usually the same one: with all these machines and all these people standing around, why not just pull it out?
Because it doesn't get pulled out. It gets handed out.
A large dinosaur travels in sections. The heaviest piece — body and chassis together — can run to several tonnes. Inside the container it has no wheels and no lifting points. Every bit of load has to be built on the spot out of slings and the chassis itself.
So unloading isn't a question of strength. It's a question of never letting the load go unheld. The forklift and the crane take turns, and at no moment is the product hanging free or out of control.
Once that idea is clear, you can work out your own sequence on a site with lighter equipment or fewer hands. The run below uses a 20 m model as the example; the same six steps carry a 4 m or an 8 m, and what changes is how far you pull before the crane can reach.
Everything below assumes one thing: the load is never transferred between machines without the next one already taking weight. That single rule is what the six steps exist to protect.
Before you open the doors
The first job on site isn't opening the doors
The container truck is on site. The first thing worth looking at is the seal.
Look at the seal first
Before anything gets opened, look at the seal. It's the tamper strip on the doors, and the number on it is unique.
A broken seal, or a number that doesn't match your shipping documents, means the doors were opened somewhere along the way. Something may be missing. Something may have taken a knock.
If it doesn't look right
It's worth holding off on signing and on opening. Photograph the doors, the lock rods and the number first.
Then call the forwarder and our sales contact. That sequence keeps responsibility clear, and it tends to get things moving faster afterwards. Most carriers know this routine well.
The sequence
The six steps, in order
Two machines, one load, and a handover with no gap in it.
Forklift square to the doors, two slings rigged
A 3 t forklift lines up square with the container and comes to the door. Two 6 m slings go on the forks, each trailing end wrapped around the steel chassis or an exposed piece of frame — a part that genuinely carries load, not a bracket that only holds skin.
Pull out one third
The forklift backs up until about a third of the body is clear. That third is where the 12 t crane can reach with its sling: pull less and it can't, pull more and the centre of gravity is already outside the doors.
Watch both sides and the top of the frame for the skin catching. If it touches, change the angle rather than pushing through.
Let the crane take up first
Two 5 t, 6 m slings on the crane hook. Sling one goes to the exposed forward frame and is tensioned, not lifted — enough that the crane could hold the front if it slipped out. Sling two stays free.
This is the step people leave out. The crane should already be in position while most of the product is still inside. It carries nothing yet. It's there for the what-if.
Keep pulling until a quarter is left
Keep reversing and keep the boom following. Stop when about a quarter of the chassis is still inside — the test is whether the free sling now reaches the lifting lug at the tail.
Rig it, tension both, and the load sits balanced front to back between two points. From here it isn't being pulled any more. It's being carried.
Fully out
The forklift keeps backing until the chassis clears the doors. Both slings now carry the full weight, and the body hangs level along its own spine.
Hand over and place it
The slings come off the forks and the forklift clears out, along with anyone standing inside the slewing radius. The crane swings to the install point, and that's the unloading finished.
Before the truck arrives
Two things worth putting in the plan early
Neither is expensive. Both are easy to leave to the last morning.
Steel plate under anything soft
Plenty of parks and outdoor sites sit on soil. It looks level right up until a machine puts weight on it. The plate needs to be thick enough and wide enough that the vehicles, the load and the outriggers all end up sitting on steel rather than on dirt.
Book it at the same time as the crane and the forklift. It's the item that otherwise surfaces last, on the morning of the lift.
Strap a 5–6 m model before it moves
We wrote this one heavier than the rest, because it happened to us. A product was lying flat on the forks with no straps when it was pulled out. The centre shifted, and the whole piece rolled off.
Nobody was hurt that time. That was luck, not a property of the method. The product was damaged, the repair took time, and the schedule moved with it.
Small size invites a relaxed approach, and that's human. A multi-tonne piece gets a second look from everyone; a few hundred kilos gets treated as something to shift by hand. But a forklift doesn't become steadier because the load is lighter.
One strap, two minutes. That's the difference between "probably fine" and "not going to happen".

| Item | Quantity / specification |
|---|---|
| Mobile crane | 1 unit, 12 t minimum |
| Forklift | 1 unit, 3 t minimum |
| Slings | 4 × 5 t, 6 m long (2 on the forklift, 2 on the crane) |
| Machine operators | 2, one crane and one forklift |
| Helpers | 2 |
Keep both helpers clear of the pinch points between the frame and the doors; their job is sling angles and clearance. With a crew that has done it before, two operators and two helpers is enough — but everyone needs to know which step they take over, particularly between steps 3 and 4.
Why it works
The load changes hands without letting go
Where the weight sits at each stage, and who is holding it.
| Stage | Who is carrying | What the other one is doing | Centre of gravity |
|---|---|---|---|
| First third coming out | Forklift slings | Crane not on the job yet | Inside the container, stable |
| Sling tensioned | Forklift slings | Crane in position, carrying nothing | Near the door threshold |
| Down to a quarter | Both, mid-handover | Crane takes the tail sling and balances the spine | Outside the doors, held by the crane |
| Fully clear | Crane, all of it | Forklift releases and leaves | Fully on the hook |
At no point in that sequence is the product up in the air with nobody carrying it. That's the whole purpose of the method — not who is stronger, but that no gap opens up at the handover.
It also explains why step 3 isn't an optional extra. While the product is inside the container, its centre of gravity is stable. Once more than half is out, that centre is outside. If the crane isn't in position at that moment, the forklift is trading its own stability for the product's.
If you'd rather not do it on your own
We can sit on a video call with you, free of charge. Leave the camera running at the site and we'll tell you what each step should look like, when to pause, and when the crane can take over. Equipment and sites vary, so the advice follows whatever is actually in front of you.
Handling it yourself is completely fine too — the process is written out in this much detail precisely so that you can. It's just that on an unusually large piece, or with a crew that isn't quite sure of itself, one more pair of eyes on a screen makes for a steadier morning.
Ask for a call